User Tools

Site Tools


survey

Working Connections Surveys

All attendees are required to complete four surveys (three OVERALL surveys and one TRACK-SPECIFIC surveys) before they leave Collin College at the end of the program on Friday, July 12, 2013.

Please see the links below.

Failure to complete these surveys will make you ineligible to attend Winter Working Connections 2013 and Summer Working Connections 2014.

Working Connections First Day Survey

After lunch on Monday, please take the survey below.
Survey Link - Monday survey

Working Connections Third Day Survey
This survey has been canceled.

Working Connections Overall Survey

Before the end of the program on Friday, everyone must complete this “overall” survey.
Survey Link - Friday overall

Friday - Track-Specific Surveys

Before the end of the program on Friday, please choose only the survey below that corresponds to the single track you attended this week.
Advanced Network Analysis, Troubleshooting, and Security (Wireshark)
Citrix Application Virtualization
EMC Cloud Infrastructure and Services
Installing and Configuring Windows Server 2012
Introduction to Forensics
Introduction to iOS Mobile Programming
VMWare vSphere 5.1

Thank you for participating!

survey.txt · Last modified: 2018/11/14 10:33 by admin